Jalan Pelabuhan Patimban Km. 6,1 Patimban, Subang. www.patimbanindustrialestate.co.id

+62 88 7700 7700

[gt-link lang="en" label="EN |" widget_look="lang_names"] [gt-link lang="id" label="ID |" widget_look="lang_names"] [gt-link lang="zh-CN" label="中文 |" widget_look="lang_names"] [gt-link lang="ja" label="日本語 |" widget_look="lang_names"] [gt-link lang="ko" label="한국어 |" widget_look="lang_names"]
[GTranslate]

Trans-Java Toll Road

Update per Q3 2025

Patimban Tol Access

This photo illustrates the construction progress of the Patimban Access Toll Road, which will directly connect Patimban Port to the Cipali Toll Road at KM 89. The new toll is scheduled for construction completion in Q4 2026 and will begin operations in Q1 2027. Once operational, it will reduce travel time by up to 50% compared to the current route via the Cipali Toll at KM 72.

Contact Us:

www.patimban industrialestate.co.id

+62 88 7700 7700